top of page


Case Study
As licenced Durasteel installers, Advanced Smoke Group secured the contract to install the fire rated ductwork at high level above the trains using the new Elizabeth Line.
Type of system
No controls duct work installation, special project.

Equipment installed
Installation of fire rated Durasteel duct work

Location
London

Number Of Levels
2 levels

Type Of Building
Central London railway terminus

Date Of Commissioning
April 2017
bottom of page